We refresh and fully renovate kitchens across Toronto and the GTA, with our own crew handling the cabinets, counters, tile, flooring and lighting.
Tell us about the job. We respond to inquiries within 4 hours on average, Monday to Saturday, 8am to 10pm.
Most kitchen jobs fall into one of three sizes. A refresh keeps your layout and cabinet boxes, refinishes the cabinets and replaces the counters, backsplash and lighting. A full renovation keeps the layout but replaces the cabinets, counters, backsplash, flooring and lighting. A layout change moves things around, which can mean new plumbing, new electrical and custom cabinetry. We do all three, and every trade is in-house.
New cabinet design and installation, or refinishing and repainting the cabinets you have when the boxes are still solid.
Quartz, marble and granite countertops, measured after the cabinets are set so the fit is right.
Subway tile and other backsplash styles, laid out from a level line so the rows stay straight across the wall.
Sinks, faucets and connections for the dishwasher, reworked where the layout changes.
Potlights, under-cabinet and pendant lighting, and the electrical upgrades a new kitchen layout needs.
New flooring, drywall repairs where walls were opened, and paint, so the kitchen is finished when we leave.
A kitchen has more ordering and scheduling than most rooms. Here is the order we work in, and the owner personally oversees every job.
Tell us what you want to change and when you would like it done. We answer Monday to Saturday, 8am to 10pm, and respond to inquiries within 4 hours on average.
We measure the room, look at the plumbing and electrical, and talk through the layout, storage and finishes you want.
You get a written quote that spells out the scope. Our contracts are fair to both sides, and we keep general contracting costs down because most of the work is done by our own crew.
We handle the design with you, pull permits and book inspections when the job needs them, and place the cabinet order. New cabinets usually take about 4 to 10 weeks from order, so we plan the start date around that.
Tear-out, plumbing and electrical, drywall, flooring, cabinets, then counters. Countertops are measured once the cabinets are in and fabricated after that, then the backsplash and lighting finish the room.
We walk the kitchen with you and fix anything that is not right. Every job comes with our written workmanship warranty.
Real kitchens from our before and after gallery, including photos taken while the work was underway.


Quartz counters, subway tile backsplash and matte gold hardware.


Subway tile, full backsplash and professional grouting.
Before HST, a kitchen refresh typically runs $8,000 to $18,000, a full renovation on the same layout $30,000 to $60,000, and layout changes, custom cabinetry or high-end finishes start at $60,000. Cabinet choice, counter material, layout changes and distance move the price most. Every job gets a free written quote after a site visit, and our free estimate calculator gives you a rough range now.
A refresh usually takes 2 to 3 weeks, allowing for countertop fabrication. A full renovation takes about 4 to 7 weeks on site once work starts. New cabinets have a lead time of about 4 to 10 weeks from order, so we plan the start date around it.
If the cabinet boxes are solid and you like the layout, refinishing them is the heart of a refresh, which costs far less than a full renovation. If the boxes are worn, or you want a different layout, new cabinets make more sense. We look at them on the site visit and tell you which way we would go.
Yes. Layout changes can mean new plumbing and electrical, and opening a wall can mean structural work like a new beam. We handle the design, and when the job needs a permit we pull it and book the inspections.
You choose the tile you want. Our tile work covers the installation and basic materials, but not the tile itself, so you are free to pick any style and we install it.
No. Every trade is done in-house by our own crew, from the tear-out to the backsplash. That keeps the schedule in our hands and the general contracting cost down.
We are WSIB certified and carry $5M in liability insurance. Every job comes with our written workmanship warranty, and the owner personally oversees every job.
Planning your budget? Read How Much Does a Kitchen Renovation Cost in Toronto?
We renovate kitchens in these cities and the neighbourhoods around them. Not sure if you are in our area? Call and ask.